[Case Study of Aeration Pipe Replacement at Wastewater Treatment Plant] Food Factory
Case of replacing the air piping and diffuser pipes in the first and second aeration tanks of a wastewater treatment plant.
We would like to introduce a case of replacement work for the aeration pipes at a wastewater treatment plant conducted at a food factory. The air piping and aeration pipes in the first and second aeration tanks of the wastewater treatment plant were experiencing cracks and breaks due to aging, resulting in insufficient air supply. We updated the piping and selected aeration pipes with enhanced capacity compared to the previous specifications. As a result of replacing seven pipes, we were able to secure a sufficient air supply. [Case Overview] ■ Company that performed the work: Food factory ■ Details of the work: Replacement of air piping and aeration pipes in the first and second aeration tanks of the wastewater treatment plant ■ Issues faced: Insufficient air supply due to cracks and breaks in the piping and failures of the aeration pipes caused by aging *For more details, please download the PDF or feel free to contact us.
- Company:MJI 本社工場
- Price:Other